Schematic design

The  schematic design has been developed with staff and incorporates feedback received from stakeholders and the community throughout our consultations to date. This level of the design shows the detailed layout of each of the departments within the new hospital building. 

Community pop-ups were held to seek feedback on this level of the design, at Mackenzie Mall (outside Coles/Service NSW) on 1 and 2 April 2025. Staff and stakeholder meetings and workshops were also held during March and April 2025.  

A summary report of the consultation and feedback received is included here. 

Below is the fly through video and three artist impressions.