Schematic design

The  schematic design has been developed with staff and incorporates feedback received from stakeholders and the community throughout our consultations to date. This level of the design shows the detailed layout of each of the departments within the new hospital building. 

Community consutlation was held on 17-18 August at the Highlands Hub in Glen Innes and feedback on the schematic design can still be provided by emailing the project team at: HI-Gleninnes-Redevelopment@health.nsw.gov.au 

Below is the schematic design and two artist impressions (view of the main entry from the carpark, and overall aerial view).