Schematic design

The schematic design has been developed with staff and incorporates feedback received from stakeholders and the community. This level of the design shows the detailed layout of each of the departments within the new hospital building. 

Community drop-in sessions were held in Gunnedah on 16-17 August 2023 and the consultation report is available here.

Feedback can also be provided by emailing the project team at: HI-Gunnedah-Redevelopment@health.nsw.gov.au 

Below is the updated schematic design and artist impression. 
230712_Gunnedah-media-images_V12.jpg